Compacted Clay Liner — Landfill Construction

High-plasticity, low-permeability clay for landfill cell construction. Processed and moisture-conditioned to meet RCRA Subtitle D, 40 CFR Part 258, and TCEQ 30 TAC Chapter 330 requirements. Supplied with test data. Ready to compact from delivery.

RCRA Subtitle D Compliant | TCEQ 30 TAC Ch. 330t | 40 CFR Part 258t | Moisture Conditionedt | Test Data Supplied

1×10⁻⁷ cm/s

Max hydraulic conductivity — TCEQ threshold met

LL 30%+

Liquid limit meets TCEQ minimum

PI 15%+

Plasticity index meets TCEQ minimum

No. 200 30%+

Fines content meets TCEQ minimum

Landfill Liner Clay

Compacted Clay Liner

RCRA Subtitle D Compliant TCEQ 30 TAC Ch. 330 40 CFR Part 258 Moisture Conditioned Test Data Supplied
TCEQ and Federal Compliance
Parameter Requirement Hudson CCL
Liquid limit (LL) 30% or greater Meets
Plasticity index (PI) 15% or greater Meets
Passing No. 200 sieve More than 30% Meets
Hydraulic conductivity Max 1×10⁻⁷ cm/s Meets
Min liner thickness 2 feet compacted Supplied to spec
Moisture conditioning Workable range Conditioned

References: RCRA Subtitle D · 40 CFR Part 258 · TCEQ 30 TAC Chapter 330 · TCEQ RG-534

A landfill liner is a regulatory, environmental, and financial commitment monitored for decades after closure. Our CCL is supplied with that standard in mind — not close enough.
Material specification
  • High-plasticity clay — LL 30%+, PI 15%+, fines 30%+
  • Hydraulic conductivity at or below 1×10⁻⁷ cm/s when compacted
  • Uniform PI and composition load to load — no weak zone interfaces
  • Moisture-conditioned — workable and compactable on delivery
  • Test data supplied with every load for regulatory submission
Supply and documentation
  • Test data structured for TCEQ regulatory submission
  • Consistent PI for repeatable QA/QC testing by lift
  • Volume and scheduling matched to your cell programme
  • Available to civil earthworks and environmental contractors

What makes this product perform.

Expand each panel for the technical detail.

  • Landfill liner construction in the United States falls under RCRA, with municipal solid waste facilities regulated under Subtitle D and codified in 40 CFR Part 258. Federal design standards require a composite liner system incorporating a minimum two feet of compacted clay achieving a hydraulic conductivity of no greater than 1×10⁻⁷ cm/s, overlain by a geomembrane. In Texas, TCEQ administers these requirements under 30 TAC Chapter 330, with additional guidance in RG-534. TCEQ specifications require liquid limit of 30% or greater, plasticity index of 15% or greater, more than 30% passing the No. 200 sieve, and a maximum hydraulic conductivity of 1×10⁻⁷ cm/s when compacted. Our CCL material is supplied to meet these thresholds — confirming the clay arriving on site is fit for purpose before a pad foot roller touches it.

    RCRA Subtitle D / 40 CFR Part 258 / TCEQ 30 TAC Ch. 330 / TCEQ RG-534

  • A compacted clay liner is built lift by lift, and every lift needs to bond with the one beneath it to form a continuous, homogeneous barrier. Variability in clay mineralogy, plasticity, or moisture content between loads introduces weak zones — interfaces where hydraulic conductivity is higher than the surrounding material and where leachate will eventually find a path. Our clay is processed to deliver uniform composition and plasticity from load to load, supporting repeatable compaction behaviour that allows QA/QC testing to confirm performance rather than uncover surprises.

    Uniform PI load to load / No weak zone interfaces / QA/QC confirmable

  • The material arrives at a moisture content within the workable range — plastic enough to remould fully under compaction and achieve the inter-lift bonding an effective liner depends on, but firm enough to support construction equipment and maintain grade. This is not a product where close enough is acceptable. A landfill liner is a regulatory, environmental, and financial commitment that will be monitored for decades after closure. The material that goes into it needs to perform from day one and hold its integrity long after the site is capped.

    Workable moisture on delivery / Supports construction plant / Inter-lift bonding achieved

– Get a Material Assessment

Share your project details and we will come back to you promptly.

Tell us where the project is, roughly what volumes you are generating, and share any geotechnical data you have. Our team will give you an initial view on suitability — at no cost and with no obligation.

Or call us directly at:
817-343-8797

– Aggregate Products

Other Products

  • C33 Concrete Sand

    • Free of organic impurities

    • Meets ASTM C33


    Concrete production · Ready mix · Mortar base

  • Fine Masonry Sand

    • Less than 0.6mm grain
    • Meets ASTM C144

    Masonry · Mortar mix · Leveling · Landscaping

  • #57 Washed Stone

    • CA7 / B-Stone / #6 Stone
    • Clean, uniform grade

    Concrete · Road base · Drainage systems

  • Washed #8 Pea Gravel

    Natural, no larger than 1/2"
    Washed and graded

    Drainage · Landscaping · Pipe bedding

  • Sedimentary Clay

    Highly impermeable
    • Fine grade, consistent

    Pond liners · Cement production · Landfill cell construction

  • 3x5 Construction Entrance Rock Stone

    • 1" to 3" angular quarried stone

    • SWPPP stabilised entrance compliant

    Site access · Tyre scraping · Haul roads · SWPPP BMP

  • Rip Rap Stone

    • 8" to 18" angular quarried stone

    • Low absorption, durable

    Channel banks · Slope protection · Outfall · Culvert aprons

  • Heavy Rip Rap Stone

    • 18"+ angular armourstone

    • High-velocity hydraulic applications

    Bridge abutments · Embankment toes · High-flow channels

– Ready to Work Together

The only facility in DFW that closes the loop.

No broker. No middleman. We take the waste, run the plant, and produce the aggregate — all from one permitted facility in Kennedale.

– Contractors and Buyers

Get your quote.
Build with it.

Local supply, natural material, ASTM-certified. Tell us what you need and we'll have pricing back within two hours.

– Haulers and Disposers

Stop driving past us. Drop it off.

Local supply, natural material, ASTM-certified. Tell us what you need and we'll have pricing back within two hours.

7530 HUDSON CEMETERY RD, KENNEDALE TX 76060 — CONVENIENTLY LOCATED FOR THE ENTIRE DFW SOUTH CORRIDOR. SHORTER HAULS MEAN LOWER FUEL COSTS FOR YOUR FLEET.