A supplementary raw material built for the Midlothian corridor.

Cement production operates to narrow chemical tolerances where input consistency directly governs kiln performance and clinker quality. Hudson Aggregates has developed a processed engineered clay specifically suited to supplementary raw material applications in cement manufacturing — positioned to supply the Midlothian corridor at the scale the industry demands.

SiO₂

Within target range for raw mix silica

Al₂O₃

Consistent aluminate phase support

CaCO₃

Minimised — reduced calcination load

Under 200 mesh

Pre-ground, no further size reduction needed

Engineered Clay for Cement Process Applications

Produced from natural deposits and processed for chemical consistency. The parameters that matter to cement chemists and process engineers are where this material performs.

SiO₂

Silicon Dioxide

Alite and belite phase formation

Primary flux component governing strength development in finished cement. Supplied within target range — a reliable supplementary silica input that supports raw mix targets without compensatory adjustment.

Within target range

Al₂O₃

Aluminium Oxide

Aluminate and ferrite phase formation

Drives setting characteristics and early strength. Consistent Al₂O₃ simplifies raw mix proportioning and reduces variability that forces process corrections mid-run. Delivered within a range that supports stable raw mix chemistry across sustained production.

Consistent across production

CaCO₃

Calcium Carbonate

Calcination load and LSF management

High CaCO₃ in a supplementary input increases fuel consumption and complicates lime saturation factor management. Our material is specifically engineered to minimise CaCO₃ — reducing calcination burden and functioning as a genuine supplementary input rather than creating its own process demands.

Minimised by design

Pre-Ground to Under 200 Mesh

Grinding supplementary materials to the fineness required for raw mix homogeneity consumes energy, plant capacity, and maintenance resource. Our engineered clay arrives at your facility already ground to below 200 mesh — ready for raw mix incorporation, no further size reduction required.

For operations managing plant throughput carefully, removing a preparation step from a supplementary input stream is an immediate and practical cost advantage — one that compounds across the volumes cement-scale consumption represents.

Under 200 mesh on delivery | No additional grinding required | Immediate raw mix incorporation

A preparation step removed from your process is a cost that does not compound over your annual volume.

Quantity. Consistency. Local.

Cement manufacturing is a continuous process industry. Hudson Aggregates operates within practical hauling distance of the Midlothian corridor — lower transport cost per tonne, shorter lead times, and a supply partner that responds to volume requirements as production schedules demand.

Our production capacity is structured for sustained, large-volume supply. This is not a marginal product offering — it is a core part of what Hudson produces and what we have built our operation to supply.

Midlothian corridor | Large-volume capacity | Continuous process supply | Local — lower transport cost

Local availability at cement-scale volumes is a material factor in security of supply — not a secondary consideration.

A Partner Who Understands the Process

Supplementary raw material supply for cement manufacturing is a specialist area. We work directly with process engineers, raw mix designers, and procurement teams to confirm how our material fits within your existing feed blend and the specific chemical targets you are managing.

If you are reviewing your supplementary material sources — for cost, consistency, or security of supply — we would welcome the opportunity to put data in front of your technical team and let the material make the case.

– Ready to Work Together

The only facility in DFW that closes the loop.

No broker. No middleman. We take the waste, run the plant, and produce the aggregate — all from one permitted facility in Kennedale.

– Contractors and Buyers

Get your quote.
Build with it.

Local supply, natural material, ASTM-certified. Tell us what you need and we'll have pricing back within two hours.

– Haulers and Disposers

Stop driving past us. Drop it off.

Local supply, natural material, ASTM-certified. Tell us what you need and we'll have pricing back within two hours.

Or call us directly at:
817-343-8797

– Get a Material Assessment

Share your project details and we will come back to you promptly.

Tell us where the project is, roughly what volumes you are generating, and share any geotechnical data you have. Our team will give you an initial view on suitability — at no cost and with no obligation.

7530 HUDSON CEMETERY RD, KENNEDALE TX 76060 — CONVENIENTLY LOCATED FOR THE ENTIRE DFW SOUTH CORRIDOR. SHORTER HAULS MEAN LOWER FUEL COSTS FOR YOUR FLEET.